EXPERIENCE IN THE ENERGY TRANSITION
About Navitech
Founded in Sweden in 2021 by Niclas Jonsson, Navitech supports industry in the energy transition, from studies through delivery. The group brings together consulting, engineering, project coordination and prefabricated solutions.
With a presence in Sweden, Norway and Western Europe, including France, Switzerland and Germany, our team combines local proximity with international experience.
Consulting, engineering, project management and prefabricated modules: our complementary expertise supports new projects and upgrades.
Our priority: reduce demand and emissions, support reliable operation and manage the total cost of your installation.

QUALITY • ENVIRONMENT • SAFETY
A structured organisation, continuous improvement and care for people and the environment guide our work.

Selected project references


Switzerland · Industrial steam and district heating
IWB, Volta plant
30 MWIn Basel, a multi-fuel boiler covers peak demand in the steam district heating network and provides backup for industrial steam. It can also supply the existing back-pressure steam turbine.
- Fuel
- Natural gas, light fuel oil and micronised biomass
- Steam
- 64 bar · 450 °C
- Commissioning
- July 2025 – February 2026
For MSM May, Navitech manages the boiler, filter and burner project, procurement, detailed steam and feedwater engineering, systems integration, site work and commissioning.


France · Agro-industry and dehydration
Tereos, Aulnay-aux-Planches
30 MWReplacement of the lignite burner on a rotary drum dryer with a 30 MW multifuel burner. The system uses natural gas and micronised biomass to dehydrate alfalfa or beet pulp, depending on the season.
- Fuel
- Natural gas and micronised biomass
- Drying heat
- 300–800 °C
- Commissioning
- April 2026
Navitech delivers the combustion system under an EPC contract and upgrades steam recirculation with a new dedicated motor-driven fan. Integration accounts for the dryer’s heat demand and the constraints of the existing installation.


Sweden · Food industry
Oatly, Landskrona
10 MWConstruction of a new steam boiler plant equipped with a multifuel burner using gas and micronised biomass produced from wood pellets. Biomass is prepared on site and stored in silos. The installation includes a 90 m³ steam accumulator; combining fuels provides supply redundancy.
- Fuel
- Gas and micronised biomass produced from wood pellets
- Steam
- 25 bar(g)
- Commissioning
- 2024
Navitech supports the project under EPCM: feasibility study, design, project and site management, followed by commissioning.


Sweden · Food industry, ketchup production
Orkla, Fågelmara
2 × 2 MWTwo prefabricated steam modules serve the processes of a factory producing around 30,000 tonnes of ketchup per year. The boilers are assembled in containers at Navitech Solutions AB’s workshops. Flue gas treatment combines an economiser and an electrostatic precipitator.
- Fuel
- A1 wood pellets
- Steam
- 16 bar(g)
- Commissioning
- May 2025
Navitech coordinates supply, installation and commissioning under EPCM. The scope includes A1 pellet storage, ash collection and connection to the existing steam network.


Sweden · Expanded polystyrene (EPS) insulation manufacturing
Finnfoam, Kristinehamn
2 MWA pellet-fired steam installation integrated into the EPS insulation manufacturing site. The module includes a compact feedwater tank and ceramic filter, connected to existing networks and safety alarms.
- Fuel
- Wood pellets
- Steam
- 16 bar(g)
- Commissioning
- 2024
Navitech provides turnkey EPC delivery, including civil works. The scope covers a steam pipe, steam air heaters for a warehouse, a compressed air room and relocation of the existing oil boiler.

France · Tyre manufacturing
Confidential client, France
10 MWAt a large tyre manufacturing plant, steam is currently produced from gas by a 30 t/h LOOS fire-tube boiler with two burners, supported by a 14 t/h boiler for top-up and backup. The solution studied replaces gas with biomass: a new boiler running on 100% agropellets, with a 10 MW multi-fuel burner and a complete micronisation line.
- Fuel
- CALYS agropellets (100% biomass)
- Steam
- Saturated steam · 16 bar
- Study
- Feasibility study · 2025
Navitech was selected to carry out the feasibility study and conceptual design of the complete installation, with a view to its EPC delivery. The project has already received national ADEME subsidies for using CALYS agropellets as fuel.

Switzerland · Hospital heating plant
HUG, Geneva
At the heating plant of Geneva University Hospitals (HUG), the study covers the integration of micronised biomass into two boilers connected to the district heating network. Each boiler is fitted with a multi-fuel burner supplied with gas, fuel oil / HVO and biomass powder; flue gases are treated in a catalytic ceramic filter with lime and ammonia injection, then recovered in an economiser.
- Fuels
- Micronised biomass, natural gas, fuel oil / HVO
- Flue gas treatment
- Catalytic ceramic filter, lime, NH₃ and economiser
- Study
- Feasibility study and preliminary design · 2025
Together with WSP, Navitech carried out the feasibility study and preliminary design (SIA phase 21): survey and analysis of the existing installation, then definition of the P&ID for the boiler system, multi-fuel combustion and flue gas treatment.
WANT TO CONNECT?
Tell us about your requirements
"*" indicates required fields

Niclas Jonsson
Founder & CEO · Navitech
Repslagaregatan 8582 22 Linköping
Sweden+46 70 565 07 64 niclas.jonsson@navitech.se

Samuel Charmillot
Managing Director · Navitech Western Europe
Chemin d’Entre-Bois 291018 Lausanne
Switzerland+41 79 790 83 32 samuel.charmillot@navitech.se